Master data
contains the main detailed objects in SAP Production Planning module. In SAP
PP, main objects are Bill of Materials, material master, routing, and work
center. Master data contains the key properties of these objects such as
production order, material type, planning requirements, goods issue, and goods
receipt.
Material master
The material master contains
information on all the materials that a company procures or produces, stores,
and sells. It is the company’s essential source for retrieving
material-specific data. This information is stored in individual material
master records. There are different views for user departments i.e. Purchasing,
Sales, Quality Management, Accounting, costing, MRP, forecasting etc. Major
settings related to production planning are available in MRP and Work
scheduling views of material master. Individual department’s users are
responsible for material master maintenance activity as per requirements.
Routing
Sequence of operations (i.e.
Work Steps) needed to make up product or assembly. A routing is used as a
source for creating a production order or a run schedule header by copying. It
describes production process. Routing also contained information like place of
work to be performed, time required to carry out work, material or component
requirement along with equipment need if any.
Bill of Material
A list of components that make
up product or assembly along with quantity and unit of measures. BOM is basis
for number of activities in many areas like CAD Department, MRP Department,
Work Scheduling Department and production order management department, Sales
Order activities and in product costing department.
Work Centers
is a place where work
(operations) is carried out. A work center is created for a plant and is
assigned to operations in routing. Data in work centers is used for scheduling,
Costing, Capacity Planning etc. Work centers are capacity collectors for
internal and external processing.
Production Resource Tools
Production Resource/Tool (PRT)
is a movable operating resource used in production planning to perform an
activity repeatedly. Examples of PRTs are Drawings, jigs and fixtures and
measuring instruments.
For SAP ERP Training or SAP PP Master Data Module Training please visit the links.
For SAP ERP Training or SAP PP Master Data Module Training please visit the links.
0 comments:
Post a Comment